Sares 22.5 MW Wind Power Plant
Sares 22.5 MW Wind Power Plant
The purpose of Sares WPP is to utilize wind energy potential in Turkey and compensate energy requirement through a sustainable, environmentally and cost effective way. GARET Enerji Üretim ve Ticaret A.Þ.(GARET) proposes to install Sares WPP with 22.5 MW installed capacity in Çanakkale Province of Turkey. Sares WPP will have 9 turbines, each having an output of 2.5 MW. The total electricity production of the project is expected to be some 90,500 MWh/year. Sares WPP will be connected via a 9 km transmission line to the 154 kV Ezine Transformer Station and the generated electricity will be supplied to Turkey's national electricity grid. Due to its significant contribution to climate change mitigation and sustainable development in the region, this project is expected to fulfil the requirements of the Gold Standard rigorously. According to the Gold Standard Toolkit, with an installed capacity of more than 15 MW, the project is a large project and fits in
Project Overview
Sares 22.5 MW Wind Power Plant | |
Carbon Offsetting | |
Renewable Energy - Wind | |
Wind | |
Garet Enerji Uretim ve Tic A.S. | |
GS963 | |
Western Asia | |
Turkey |
Project Details
2022 | |
Gold Standard (VER) | |
Reduction | |
2011 | |
51257 | |
No | |
ACM0002 Grid-connected electricity generation from renewable sources |
Registry URL
Sustainable Development Goals
-
SDG 7: Affordable and Clean Energy
-
SDG 8: Decent Work and Economic Growth
-
SDG 13: Climate Action
Delivered Documents
-
Project Design Document (PDD)
-
Verification Report
-
Emission/Project Report
-
Monitoring Report