Sares 22.5 MW Wind Power Plant

Looking for this project? It’s not listed in our marketplace, but we offer custom solutions. Request a quote and our team will create the perfect proposal for you.

Quantity per Unit: 1 Ton

Project kind: Carbon offsetting

100% Audited and Verified

Sares 22.5 MW Wind Power Plant

The purpose of Sares WPP is to utilize wind energy potential in Turkey and compensate energy requirement through a sustainable, environmentally and cost effective way. GARET Enerji Üretim ve Ticaret A.Þ.(GARET) proposes to install Sares WPP with 22.5 MW installed capacity in Çanakkale Province of Turkey. Sares WPP will have 9 turbines, each having an output of 2.5 MW. The total electricity production of the project is expected to be some 90,500 MWh/year. Sares WPP will be connected via a 9 km transmission line to the 154 kV Ezine Transformer Station and the generated electricity will be supplied to Turkey's national electricity grid. Due to its significant contribution to climate change mitigation and sustainable development in the region, this project is expected to fulfil the requirements of the Gold Standard rigorously. According to the Gold Standard Toolkit, with an installed capacity of more than 15 MW, the project is a large project and fits in

Project Overview

iconProject Name: Sares 22.5 MW Wind Power Plant
iconProject Kind: Carbon Offsetting
iconProject Type: Renewable Energy - Wind
iconProject Type from Registry: Wind
iconProject Developer: Garet Enerji Uretim ve Tic A.S.
iconProject ID: GS963
iconRegion: Western Asia
iconCountry: Turkey

Project Details

iconYear:2022
iconRegistry:Gold Standard (VER)
iconMechanism:Reduction
iconFirst Year of Project (Vintage):2011
iconEst Annual Credits:51257
iconCorsia eligable:No
iconMethodology:ACM0002 Grid-connected electricity generation from renewable sources

Sustainable Development Goals

    • check icon SDG 7: Affordable and Clean Energy
    • check icon SDG 8: Decent Work and Economic Growth
    • check icon SDG 13: Climate Action

Delivered Documents

  • check icon Project Design Document (PDD)
  • check icon Verification Report
  • check icon Emission/Project Report
  • check icon Monitoring Report

Request a Quote