Korkmaz Wind Farm Project Turkey
Korkmaz Wind Farm Project Turkey
Korkmaz Wind Farm Project, Turkey is a large scale wind farm project located in Seferihisar District, Izmir Province of Turkey. The Project is owned by Ayen Enerji A.S. (Hereafter referred to as "The Project Proponent"), a private entity.
The installed capacity of the project is 24 MW, and the project involves installation and operation of 12 wind turbines, each having a rated power output of 2 MW.The estimated annual net electricity generation of the project will be about 68,920 MWh. This electrical energy will replace electrical energy of the national grid, based mainly on various fossil fuel sources like natural gas and coal. The expected annual emission reduction to be caused by the project will be around 38,940 tonnes of CO2e. For a 7-year crediting period the expected emission reductions will be about 271,335 tonnes of CO2e. The operation of the project and electricity generation started in 2014 and the expected operational life of the project is 20 years.
Project Overview
Korkmaz Wind Farm Project Turkey | |
Carbon Offsetting | |
Renewable Energy - Wind | |
Wind | |
Ayen Enerji A. S. | |
GS1018 | |
Western Asia | |
Turkey |
Project Details
2023 | |
Gold Standard (VER) | |
Reduction | |
2018 | |
44715 | |
Yes | |
ACM0002 Grid-connected electricity generation from renewable sources |
Registry URL
Sustainable Development Goals
-
SDG 6: Clean Water and Sanitation
-
SDG 7: Affordable and Clean Energy
-
SDG 8: Decent Work and Economic Growth
-
SDG 13: Climate Action
Delivered Documents
-
Project Design Document (PDD)
-
Verification Report
-
Emission/Project Report
-
Monitoring Report