Erzurum Aziziye Solar Power Plant
Erzurum Aziziye Solar Power Plant
Erzurum Aziziye Solar Power Plant is the 10,8 MWe unlicensed grid connected solar power plant which is located in Aziziye district of Erzurum in Turkey. The 11 unlicensed project creates the Erzurum SPP which is invested by Galata Wind Enerji A.Ş. The project names are Alaköy SPP, Baroj SPP, Mir SPP, Mir 1SPP, Mor SPP, Mor 1 SPP, Pir SPP, Sarı SPP, Ser SPP, Sun SPP and Sun 1 SPP. Mor SPP capacity is 0,8 MWe and the other projects capacities are same an 1 MWe.The projects are started to electricity generation on 04/01/2019. The electricity will be fed to the grid at Erzurum TM-2, TR-B. Estimated electricity generation is 19,8 MWh per year. The electricity generation will result 10,751 tonnes of CO2/year and total emission reduction will be 53,755 tonnes of CO2e for the first crediting period. The project operational lifetime is 25 years.
Project Overview
Erzurum Aziziye Solar Power Plant | |
Carbon Offsetting | |
Renewable Energy - Solar - Centralized | |
Other | |
Galata Wind Enerji A.S. | |
GS7493 | |
Western Asia | |
Turkey |
Project Details
2022 | |
Gold Standard (VER) | |
Reduction | |
2019 | |
14067 | |
Yes | |
AMS-I.D. Grid connected renewable electricity generation |
Registry URL
Sustainable Development Goals
-
SDG 7: Affordable and Clean Energy
-
SDG 8: Decent Work and Economic Growth
-
SDG 13: Climate Action
Delivered Documents
-
Project Design Document (PDD)
-
Verification Report
-
Emission/Project Report
-
Monitoring Report