Saros Wind Power Plant
Saros Wind Power Plant
Baltalimani Enerji Yatırım Uretim ve Ticaret A.S. (hereafter referred to as "Boylam Enerji") plans investing into a new wind power project called Saros Wind Power Project (hereafter referred to as .the "Project" or "Saros WPP"), which involves installation and operation of 137.997 MWe/137.997 MWm wind power plant. The project consists of 27 turbines whose capacitites can be expressed as 27 x (5.111 MWe/ 5.111 MWm). The licence of the project was issued by Energy Market Regulatory Authority (EMRA) on 18/10/2012. The generated energy will be fed to the grid at Çanakkale Çan TM transmission line.
Project Overview
| Saros Wind Power Plant | |
| Carbon Offsetting | |
| Renewable Energy - Wind | |
| Wind | |
| BORUSAN ENBW ENERJI YATIRIMLARI VE ÜRETIM A.S. | |
| GS7801 | |
| Western Asia | |
| Turkey |
Project Details
| 2021 | |
| Gold Standard (VER) | |
| Reduction | |
| 2021 | |
| 280909 | |
| No | |
| ACM0002 Grid-connected electricity generation from renewable sources |
Registry URL
Sustainable Development Goals
-
SDG 6: Clean Water and Sanitation
-
SDG 7: Affordable and Clean Energy
-
SDG 8: Decent Work and Economic Growth
-
SDG 13: Climate Action
-
SDG 15: Life on Land
Delivered Documents
-
Project Design Document (PDD)
-
Verification Report
-
Emission/Project Report
-
Monitoring Report