Nam Long Hydropower Project

Looking for this project? It’s not listed in our marketplace, but we offer custom solutions. Request a quote and our team will create the perfect proposal for you.

Quantity per Unit: 1 Ton

Project kind: Carbon offsetting

100% Audited and Verified

Nam Long Hydropower Project

Nam Long Hydropower Project is located 50 km west of Louang Namtha and 9 km northwest of Long District, Louang Namtha Province, Lao PDR. The project is a run-of -river hydropower station. The installed capacity is 5 MW, with annually 37 GWh power supplied to the power grid. The proposed project will result in CO2 emission reduction, as it will displace the power generation that otherwise would be based on a mix of fossil fuels. The reduction in carbon dioxide emissions is estimated to be 24,035 tonnes per year.

Project Overview

iconProject Name: Nam Long Hydropower Project
iconProject Kind: Carbon Offsetting
iconProject Type: Renewable Energy - Hydropower
iconProject Type from Registry: Small
Low - Impact Hydro
iconProject Developer: Climate Bridge (Shanghai) Ltd.
iconProject ID: GS2707
iconRegion: South-Eastern Asia
iconCountry: Laos

Project Details

iconYear:2021
iconRegistry:Gold Standard (VER)
iconMechanism:Reduction
iconFirst Year of Project (Vintage):2016
iconEst Annual Credits:20864
iconCorsia eligable:No
iconMethodology:AMS-I.D. Grid connected renewable electricity generation

Sustainable Development Goals

    • check icon SDG 6: Clean Water and Sanitation
    • check icon SDG 7: Affordable and Clean Energy
    • check icon SDG 13: Climate Action

Delivered Documents

  • check icon Project Design Document (PDD)
  • check icon Verification Report
  • check icon Emission/Project Report
  • check icon Monitoring Report

Request a Quote