Kores Kocadag Wind Power Project Turkey
Kores Kocadag Wind Power Project Turkey
Kores Kocadağ Rüzgar Enerji Santralı Üretim A.Ş (Kores) invested into a new wind power plant under the licence of Kores Kocadağ Rüzgar Enerji Santralı Üretim A.Ş . Installed capacity and output capacity of the project was 17.5 MWm / 15 MWe respectively. Kores, with an aim to benefit more effectively from the wind of the project area decided to erect three more turbines, each with 2.5 MW power to increase project installed capacity to 25 MWm/25 MWe. The license of the project has been revised to reflect the changes on 2nd of July 2015. The annual electricity generation of the project is 70,400 MWh and the annual estimated emission reduction of the project for the first crediting period was 37,831 tCO2e and for the second crediting period the annual estimated amount is 39,512 tCO2e. The total estimated emission reduction is 276,584 tCO2e Also, the second crediting period will start on 24 December 2016 with 10 turbines with 25 MW total installed capacity.
1st crediting period:24/12/2009-23/12/2016 2nd crediting period:24/12/2016-23/12/2023
Project Overview
Kores Kocadag Wind Power Project Turkey | |
Carbon Offsetting | |
Renewable Energy - Wind | |
Wind | |
Innores Elektrik Uretim A.S. | |
GS601 | |
Western Asia | |
Turkey |
Project Details
2020 | |
Gold Standard (VER) | |
Reduction | |
2009 | |
36188 | |
No | |
ACM0002 Grid-connected electricity generation from renewable sources |
Registry URL
Sustainable Development Goals
-
SDG 7: Affordable and Clean Energy
-
SDG 8: Decent Work and Economic Growth
-
SDG 13: Climate Action
Delivered Documents
-
Project Design Document (PDD)
-
Verification Report
-
Emission/Project Report
-
Monitoring Report