Killik Wind Power Plant

Looking for this project? It’s not listed in our marketplace, but we offer custom solutions. Request a quote and our team will create the perfect proposal for you.

Quantity per Unit: 1 Ton

Project kind: Carbon offsetting

100% Audited and Verified

Killik Wind Power Plant

The purpose of Killik WEPP is to utilize wind energy potential in Turkey and to compensate energy requirement through a sustainable, environmentally and cost effective way. PEM Enerji A.Þ. (PEM) proposes to install Killik WPP with 40 MW installed capacity within the central district of Tokat. Killik WPP will have 16 turbines each having an output of 2.5 MW. Killik WPP will be connected via a 15 km transmission line to the 154 kV Gobel Transformer Station and the generated electricity will be supplied to Turkey's national electricity grid.

Project Overview

iconProject Name: Killik Wind Power Plant
iconProject Kind: Carbon Offsetting
iconProject Type: Renewable Energy - Wind
iconProject Type from Registry: Wind
iconProject Developer: İltek Enerji Yatırım Sanayi ve Ticaret A.Ş.
iconProject ID: GS947
iconRegion: Western Asia
iconCountry: Turkey

Project Details

iconYear:2022
iconRegistry:Gold Standard (VER)
iconMechanism:Reduction
iconFirst Year of Project (Vintage):2011
iconEst Annual Credits:55523
iconCorsia eligable:No
iconMethodology:ACM0002 Grid-connected electricity generation from renewable sources

Sustainable Development Goals

    • check icon SDG 7: Affordable and Clean Energy
    • check icon SDG 8: Decent Work and Economic Growth
    • check icon SDG 13: Climate Action

Delivered Documents

  • check icon Project Design Document (PDD)
  • check icon Verification Report
  • check icon Emission/Project Report
  • check icon Monitoring Report

Request a Quote