Dak Pone Hydropower Project
Dak Pone Hydropower Project
                The project activity involves the construction of two small-scale sub hydropower   plants including Dak Pone hydropower plant and Dak Pone 2 hydropower plant   with an installed capacity of 14 MW and 1.6 MW, respectively. It is located on the   Dak Pone and Dak Ne rivers in Mang Canh and Dak Long communes, Kon Plong   district, Kon Tum province of Viet Nam.     Prior to the implementation of the project activity, electricity in Vietnam is   generated mainly from fossil fuel sources and is solely distributed to consumers   via the unique national electricity grid.     The project's installed capacities of the two plants are 14 MW and 1.6 MW   respectively and estimated annual gross power generation 69,100 MWh. The net   electricity generated (with an estimated annual volume of 68,400 MWh).            
        Project Overview
| Dak Pone Hydropower Project | |
| Carbon Offsetting | |
| Renewable Energy - Hydropower | |
| Small Low - Impact Hydro | |
| Vietnam Carbon Assets Ltd. | |
| GS1347 | |
| South-Eastern Asia | |
| Vietnam | 
Project Details
| 2022 | |
| Gold Standard (VER) | |
| Reduction | |
| 2012 | |
| 57070 | |
| No | |
| ACM0002 Grid-connected electricity generation from renewable sources | 
Registry URL
Sustainable Development Goals
- 
                                        SDG 7: Affordable and Clean Energy 
- 
                                        SDG 8: Decent Work and Economic Growth 
- 
                                        SDG 13: Climate Action 
Delivered Documents
- 
                                Project Design Document (PDD) 
- 
                                Verification Report 
- 
                                Emission/Project Report 
- 
                                Monitoring Report 
 
	