Canakkale WPP

Looking for this project? It’s not listed in our marketplace, but we offer custom solutions. Request a quote and our team will create the perfect proposal for you.

Quantity per Unit: 1 Ton

Project kind: Carbon offsetting

100% Audited and Verified

Canakkale WPP

Çanakkale Wind Power Plant is located between Üvecik Village and Mahmudiye Town of Çanakkale Province in the Western part of Turkey. The total installed capacity is 29.9 MW and annual electricity generation is estimated to be 91,570 MWh. The project consists of 13 Siemens SWT 101 wind turbines, each having a capacity of 2.3 MWs. The electricity will be transmitted to an existing substation at Çanakkale Natural Gas Fired Power Plant via an underground power line. The project was operational on 11th February 2011 and registered on 3rd August 2012 under the Gold Standard.

Project Overview

iconProject Name: Canakkale WPP
iconProject Kind: Carbon Offsetting
iconProject Type: Renewable Energy - Wind
iconProject Type from Registry: Wind
iconProject Developer: Enerjisa Enerji Uretim A.S.
iconProject ID: GS906
iconRegion: Western Asia
iconCountry: Turkey

Project Details

iconYear:2023
iconRegistry:Gold Standard (VER)
iconMechanism:Reduction
iconFirst Year of Project (Vintage):2011
iconEst Annual Credits:54377
iconCorsia eligable:No
iconMethodology:ACM0002 Grid-connected electricity generation from renewable sources

Sustainable Development Goals

    • check icon SDG 7: Affordable and Clean Energy
    • check icon SDG 8: Decent Work and Economic Growth
    • check icon SDG 13: Climate Action

Delivered Documents

  • check icon Project Design Document (PDD)
  • check icon Verification Report
  • check icon Emission/Project Report
  • check icon Monitoring Report

Request a Quote