Bares II Wind Power Plant Turkey
Bares II Wind Power Plant Turkey
Bares Elektrik Üretim A.Þ. implemented a wind power plant in Balýkesir province of Turkey. The project is located in the Balikesir city close to the coastline of the Sea of Marmara, Turkey. The project involves the installation of 20 unit of GE1,5SE wind power turbines with a total capacity of 30 MW. Expected annual electricity generation is 109.9 GWh. Annualy calculated emission reduction is 71,710 tCO2e. Power plant is in operation since June 2006.
Project Overview
Bares II Wind Power Plant Turkey | |
Carbon Offsetting | |
Renewable Energy - Wind | |
Wind | |
Bilgin Güc Santralleri Enerji Üretim A.S | |
GS1072 | |
Western Asia | |
Turkey |
Project Details
2023 | |
Gold Standard (VER) | |
Reduction | |
2011 | |
71710 | |
No | |
ACM0002 Grid-connected electricity generation from renewable sources |
Registry URL
Sustainable Development Goals
-
SDG 6: Clean Water and Sanitation
-
SDG 7: Affordable and Clean Energy
-
SDG 8: Decent Work and Economic Growth
-
SDG 13: Climate Action
Delivered Documents
-
Project Design Document (PDD)
-
Verification Report
-
Emission/Project Report
-
Monitoring Report