Liki Pinangawan Muaralaboh Geothermal Power Plant
Liki Pinangawan Muaralaboh Geothermal Power Plant
Liki Pinangawan Muaralaboh Geothermal Power Plant (hereinafter referred to as the project activity) is an 88.81MW greenfield geothermal power project in West Sumatera Province, along the Sumatera Fault System (SFS) in Indonesia. The project being implemented by PT Supreme Energy Muara Laboh (PT SEML) (hereinafter referred to as the project owner) is a grid connected geothermal power plant and supplies low emission power to the Sumatera grid (hereinafter referred to as the grid). The project activity consists of one turbine of 88.81MW that is installed in the southern Muara Laboh resource area (WKP). The power plant generates electricity to export to the state-owned electricity company, PT Perusahaan Listrik Negara (herein referred to as PT PLN) via Sumatera Grid.
Project Overview
Liki Pinangawan Muaralaboh Geothermal Power Plant | |
Carbon Offsetting | |
Renewable Energy - Geothermal | |
Geothermal | |
PT. SUPREME ENERGY MUARA LABOH | |
GS12112 | |
South-Eastern Asia | |
Indonesia |
Project Details
2023 | |
Gold Standard (VER) | |
Reduction | |
2020 | |
382076 | |
No | |
ACM0002 Grid-connected electricity generation from renewable sources |
Registry URL
Sustainable Development Goals
-
SDG 7: Affordable and Clean Energy
-
SDG 8: Decent Work and Economic Growth
-
SDG 13: Climate Action
Delivered Documents
-
Project Design Document (PDD)
-
Verification Report
-
Emission/Project Report
-
Monitoring Report