Saros Wind Power Plant

Looking for this project? It’s not listed in our marketplace, but we offer custom solutions. Request a quote and our team will create the perfect proposal for you.

Quantity per Unit: 1 Ton

Project kind: Carbon offsetting

100% Audited and Verified

Saros Wind Power Plant

Baltalimani Enerji Yatırım Uretim ve Ticaret A.S. (hereafter referred to as "Boylam Enerji") plans investing into a new wind power project called Saros Wind Power Project (hereafter referred to as .the "Project" or "Saros WPP"), which involves installation and operation of 137.997 MWe/137.997 MWm wind power plant. The project consists of 27 turbines whose capacitites can be expressed as 27 x (5.111 MWe/ 5.111 MWm). The licence of the project was issued by Energy Market Regulatory Authority (EMRA) on 18/10/2012. The generated energy will be fed to the grid at Çanakkale Çan TM transmission line.

Project Overview

iconProject Name: Saros Wind Power Plant
iconProject Kind: Carbon Offsetting
iconProject Type: Renewable Energy - Wind
iconProject Type from Registry: Wind
iconProject Developer: BORUSAN ENBW ENERJI YATIRIMLARI VE ÜRETIM A.S.
iconProject ID: GS7801
iconRegion: Western Asia
iconCountry: Turkey

Project Details

iconYear:2023
iconRegistry:Gold Standard (VER)
iconMechanism:Reduction
iconFirst Year of Project (Vintage):2021
iconEst Annual Credits:280909
iconCorsia eligable:No
iconMethodology:ACM0002 Grid-connected electricity generation from renewable sources

Sustainable Development Goals

    • check icon SDG 6: Clean Water and Sanitation
    • check icon SDG 7: Affordable and Clean Energy
    • check icon SDG 8: Decent Work and Economic Growth
    • check icon SDG 13: Climate Action
    • check icon SDG 15: Life on Land

Delivered Documents

  • check icon Project Design Document (PDD)
  • check icon Verification Report
  • check icon Emission/Project Report
  • check icon Monitoring Report

Request a Quote