Liki Pinangawan Muaralaboh Geothermalkraftwerk
Liki Pinangawan Muaralaboh Geothermalkraftwerk
Liki Pinangawan Muaralaboh Geothermal Power Plant (hereinafter referred to as the project activity) is an 88.81MW greenfield geothermal power project in West Sumatera Province, along the Sumatera Fault System (SFS) in Indonesia. The project being implemented by PT Supreme Energy Muara Laboh (PT SEML) (hereinafter referred to as the project owner) is a grid connected geothermal power plant and supplies low emission power to the Sumatera grid (hereinafter referred to as the grid). The project activity consists of one turbine of 88.81MW that is installed in the southern Muara Laboh resource area (WKP). The power plant generates electricity to export to the state-owned electricity company, PT Perusahaan Listrik Negara (herein referred to as PT PLN) via Sumatera Grid.
Projektübersicht
Liki Pinangawan Muaralaboh Geothermalkraftwerk | |
Kohlenstoffausgleich | |
Erneuerbare Energie - Geothermie | |
Geothermie | |
PT. SUPREME ENERGY MUARA LABOH | |
GS12112 | |
Südostasien | |
Indonesien |
Details zum Projekt
2020 | |
Gold Standard (VER) | |
Reduktion | |
2020 | |
382076 | |
Nein | |
ACM0002 Netzeingespeiste Stromerzeugung aus erneuerbaren Quellen |
Registrierungs-URL
Ziele für nachhaltige Entwicklung
-
SDG 7: Bezahlbare und saubere Energie
-
SDG 8: Menschenwürdige Arbeit und Wirtschaftswachstum
-
SDG 13: Maßnahmen zum Klimaschutz
Gelieferte Dokumente
-
Projektdesign-Dokument (PDD)
-
Verifizierungsbericht
-
Emissions-/Projektbericht
-
Überwachungsbericht