Killik Windkraftanlage
Killik Windkraftanlage
The purpose of Killik WEPP is to utilize wind energy potential in Turkey and to compensate energy requirement through a sustainable, environmentally and cost effective way. PEM Enerji A.Þ. (PEM) proposes to install Killik WPP with 40 MW installed capacity within the central district of Tokat. Killik WPP will have 16 turbines each having an output of 2.5 MW. Killik WPP will be connected via a 15 km transmission line to the 154 kV Gobel Transformer Station and the generated electricity will be supplied to Turkey's national electricity grid.
Projektübersicht
Killik Windkraftanlage | |
Kohlenstoffausgleich | |
Erneuerbare Energie - Windkraft | |
Windkraft | |
İltek Enerji Yatırım Sanayi ve Ticaret A.Ş. | |
GS947 | |
Westasien | |
Türkei |
Details zum Projekt
2023 | |
Gold Standard (VER) | |
Reduktion | |
2011 | |
55523 | |
Nein | |
ACM0002 Netzeingespeiste Stromerzeugung aus erneuerbaren Quellen |
Registrierungs-URL
Ziele für nachhaltige Entwicklung
-
SDG 7: Bezahlbare und saubere Energie
-
SDG 8: Menschenwürdige Arbeit und Wirtschaftswachstum
-
SDG 13: Maßnahmen zum Klimaschutz
Gelieferte Dokumente
-
Projektdesign-Dokument (PDD)
-
Verifizierungsbericht
-
Emissions-/Projektbericht
-
Überwachungsbericht