Dongrui Tiermistmanagementsystem GHG-Minderungsprojekt in der Stadt Heyuan
Dongrui Tiermistmanagementsystem GHG-Minderungsprojekt in der Stadt Heyuan
The project installs new animal waste management systems (AWMSs) to a group of 8 swine farms in Heyuan City. The project activity replaces the current open anaerobic lagoons with new AWMSs, and Each subsidiary swine farm will install one AWMS. All the manure and wastewater are collected and then be separated first. The separated solid are treated in aerobic composting system to produce fertilizer and part of the fertilizer will be distributed to the surrounding farmers free of charge to improve the life condition of farmers and the others will be sold to the market. The separated liquid is treated through anaerobic digestion, the biogas generated during the treatment process is captured for power generation and surplus biogas is destroyed through the flaring system (if any). The electricity generated are all used by the operation of AWMSs and the 8 swine farms. It is estimated that total 46,435,884m3 biogas are expected to be generated annually and each generator is installed in each subsidiary swine farm, total installed capacity of the proposed project is 8.1MW and the annual electricity production is estimated to be 59,435MWh. After anaerobic digestion. The sludge produced from anaerobic digestion will be treated through aerobic composting together with the separated solid and the effluent will be used as a liquid organic fertilizer for the irrigation of agriculture.
Projektübersicht
Dongrui Tiermistmanagementsystem GHG-Minderungsprojekt in der Stadt Heyuan | |
Kohlenstoffausgleich | |
Landwirtschaft - Gülle-Methanvergärungsanlage | |
Biogas – Elektrizität | |
Profit Carbon Environmental Energy Technology (Shanghai) Co. Ltd. | |
GS11674 | |
Ostasien | |
China |
Details zum Projekt
2022 | |
Gold Standard (VER) | |
Reduktion | |
2021 | |
423531 | |
Nein | |
ACM0010 Reduktion von Treibhausgasemissionen durch Güllemanagementsysteme |
Registrierungs-URL
Ziele für nachhaltige Entwicklung
-
SDG 7: Bezahlbare und saubere Energie
-
SDG 8: Menschenwürdige Arbeit und Wirtschaftswachstum
-
SDG 13: Maßnahmen zum Klimaschutz
Gelieferte Dokumente
-
Projektdesign-Dokument (PDD)
-
Verifizierungsbericht
-
Emissions-/Projektbericht
-
Überwachungsbericht