Windkraftanlage Elmali (WPP)
Windkraftanlage Elmali (WPP)
Elmali WPP project site is located in Tasucu town of Silifke district in the city of Mersin, in the Meditarranean region in Turkey. The Company Hanay Elektrik Üretim A.S. (in the followings the Developer) is a Peker Group company and obtained the Electricity Generation License in 2012. The Project involves the installation of 15 wind turbines which each having an output of 1.8 MW with a total capacity of 27 MW and the development of a high voltage transmission line between the proposed project area and the national grid. Based on the technical feasibility of the proposed project activity, an estimated net electricity of 91,600 MWh/year will be produced by the project activity and delivered to the national grid. The annual emission reductions are estimated as 53,253 tCO2-eq/years ex-ante.
Projektübersicht
Windkraftanlage Elmali (WPP) | |
Kohlenstoffausgleich | |
Erneuerbare Energie - Windkraft | |
Windkraft | |
HANAY ELEKTRİK ÜRETİM ANONİM ŞİRKETİ | |
GS4442 | |
Westasien | |
Türkei |
Details zum Projekt
2024 | |
Gold Standard (VER) | |
Reduktion | |
2019 | |
53253 | |
Ja | |
ACM0002 Netzeingespeiste Stromerzeugung aus erneuerbaren Quellen |
Registrierungs-URL
Ziele für nachhaltige Entwicklung
-
SDG 7: Bezahlbare und saubere Energie
-
SDG 8: Menschenwürdige Arbeit und Wirtschaftswachstum
-
SDG 13: Maßnahmen zum Klimaschutz
Gelieferte Dokumente
-
Projektdesign-Dokument (PDD)
-
Verifizierungsbericht
-
Emissions-/Projektbericht
-
Überwachungsbericht